beautypg.com

American Energy Systems MF3626 Door Handle User Manual

Page 3

background image

F:\AESBusinessSystems\AES Technical\Piece part instructions\MF3626 Door handle Assembly.doc

Operation: Attach door (continued)

6. The 3

rd

test confirms that the rope gasket is adequately centered on the doorframe when the door

is latched tight.


7. The 4

th

test is a final check to make sure the door is not tilted.


Measure the distance between the top of the doorframe and the edge of the main body.
Then measure between the bottom of the doorframe to the edge of the main body
The difference between the 2 measurements must be 2 mm (.06”) or less .


Chalk the doorframe
as shown and then
latch the door tight
to transfer the chalk
from the doorframe
to the rope gasket.

Open the door and see that
the chalk lines are
approximately centered on
the gasket. Minimum
requirement is at least .06”
between the edge of the chalk
and the edge of the gasket.