beautypg.com

Appendix b - troubleshooting and maintenance, B.1 installation problems, B appendix: troubleshooting and maintenance – ADLINK PXES-2590 User Manual

Page 83: Installation problems, Appendix b - troubleshooting and mainte- nance

background image

Troubleshooting and Maintenance

73

PXES-2590

Appendix B - Troubleshooting and Mainte-

nance

This Appendix describes basic troubleshooting techniques, as well

as instructions for the maintenance of the PXES-2590 chassis.

B.1 Installation Problems

Inability to start the system frequently results from incorrect instal-
lation of the system controller, peripheral modules, and other com-
ponents. Before starting the system, please ensure that:

X

The system controller is properly installed and secured

X

All peripheral modules are properly seated on the slots

X

All cables are properly connected to the system controller

and peripheral modules

X

All installed peripheral modules are compatible for use in

the chassis

X

The power cord is securely plugged into the chassis power

connector and power outlet/wall socket/power strip

If the system fails to start when all installation conditions are met,
remove all installed peripheral modules and try again. If the sys-
tem starts normally, instal one peripheral module at a time fol-
lowed by powering up. You may also try installing the modules into
different slots until the desired result is obtained