Nespresso Citiz & Co EF 488 User Manual
Page 66

Citiz service manual
66
R E P A I R S
Assembly checkpoints
•
All covers are assembled on the core unit.
•
Check that wiring between core unit and platform is led through cable fixation (71).
•
Use marked cable guides to lay wires in platform (refer to "Replacing power cord"
on page 62 and following).
•
Check wiring (see "Wiring diagrams model Citiz" on page 118 and following).
•
During assembly of the water tank connector (53) on the platform, each of its 3
latches has to engage with an audible click.
This manual is related to the following products: