Save these instructions, Using this manual – Winco ULPSS90/D WITH DSE 7310 CONTROL (2014) User Manual
Page 2
48-00
60706-51
SAVE THESE INSTRUCTIONS
This manual contains important instructions
that should be followed during installation and
maintenance of the generator and batteries.
Read and understand all instructions in the manual
before starting and operating the generator set.
USING THIS MANUAL
Congratulations on your choice of a Winco generator set.
You have selected a high-quality, precision-engineered
generator set designed and tested to give you years of
satisfactory standby service.
To get the best performance from your new engine
generator set, it is important that you carefully read and
follow the operating instructions in this manual.
Should you experience a problem please follow the
“Things To Check” near the end of this manual. The
warranty listed in this manual describes what you can
expect from WINCO should you need service assistance
in the future.
COPY YOUR MODEL AND SERIAL NUMBER
HERE
No other WINCO generator has the same serial number
as yours. It is important that you record the number and
other vital information here. If you should ever need to
contact us on this unit it will help us to respond to your
needs faster.
MODEL_____________________________________
SERIAL NUMBER____________________________
PURCHASE DATE____________________________
DEALER____________________________________
TABLE OF CONTENTS
INTRODUCTION
GUIDE TO PRODUCT SAFETY
3
BASIC INFORMATION
4
Description
4
DSE 7310 Engine Control
5
Specification Table
5
PREPARING THE UNIT
Unpacking the unit
6
ENGINE GENERATOR INSTALLATION
Installation
6
Fuel Line Installation
7
Fuel Pressure Tables
7
LP Liquid Withdrawal
8
Lubrication
8
Coolant
8
Battery Installation
9
Battery Charger/Block Heater Wiring
9
AC Electrical Connections
10
DC Electrical Connections
11
ENGINE CONTROL PANEL LAYOUT
13
DSE 7310 CONTROLLER
13
INITIAL START-UP
14
START-UP PROCEDURE
14
EXERCISER CLOCK
15
TROUBLESHOOTING INFORMATION
15
CHANGING THE FUEL TYPE
16
GENERATOR END SPECIFICATION
16
ENGINE SPECIFICATIONS
17
ENGINE MAINTENANCE SCHEDULE
18
VOLTAGE REGULATOR WIRING
19
AC WIRING - THREE PHASE
77/480 Volt
0
10/08 Volt
0
10/40 Volt
1
AC WIRING - SINGLE PHASE
10/40 Volt
1
DC SCHEMATIC - WIRING DIAGRAM
OUTLINE DRAWING
3
12 MONTH WARRANTY
4
PROPER USE AND INSTALLATION
You must be sure your new engine generator set is:
*
Properly serviced before starting
*
Operated in a well ventilated area
*
Properly exhausted and gases safely dispersed
*
Wired by a qualified electrician
*
Operated only for its designed purposes
*
Used only by operators who understand its
operation
*
Properly maintained