Tie Down Vector Dynamics Foundation System for Wind Zones IBC 2009 User Manual

Index

background image

INSTALLATION INSTRUCTIONS

For HUD Code Wind Zone 1, or IBC 2009,

90 mph, Exposure C

Version 12/9/2009

INDEX

PAGE

SECTION

NUMBER

INTRODUCTION

2

GENERAL INSTALLATION

3

PARTS LIST

4 & 5

LONGITUDINAL DEVICES

6

PIER HEIGHTS

7

Roof Pitch

8

SET-UP INSTRUCTIONS

9

FOOTER SIZES
WIND ZONE I

- SINGLE

10

- DOUBLE

11

- TRIPLE

12

- HIGH PIER

13

V-DRIVE & PIER SYSTEMS

14

SOIL CLASSIFICATION

15

CONCRETE INSTALLATION

16 & 17

ASPHALT INSTALLATION

18

COMPONENT PARTS AVAILABLE UPON REQUEST

D1095

Approval

This manual is related to the following products: