beautypg.com

Fieldpilot, V1 c1 v2 c2 – TeeJet FieldPilot Install AgChem 1803 User Manual

Page 17

background image

www.teejet.com

16

FieldPilot

®

8. INSTALL STEERING OUTPUT HOSES TO

THE COUNTERBALANCE VALVE

Hoses

(P)

are first connected to the left and right steering ports on the orbital steering valve with the other

end connected to ports V1 and V2 of the counterbalance valve

(F)

. The two hoses

(O)

from the A and B

ports of the FieldPilot Valve

(E)

are now connected to the ends of the Run Tee adapters installed on ports

C1 and C2 of the counterbalance valve

(F)

. Finally, the two original hoses removed from the left and right

steering ports on the orbital steering valve are connected to the branches of the two Run Tee fittings on the

C1 and C2 ports of the counterbalance valve

(F)

.

Figure 1-14: Install Steering Output Hoses

V1

C1

V2

C2

This completes the hydraulic kit installation. Be sure all fittings are tight and all hoses are supported Also

ensure there are no chafe points in the hose runs.