beautypg.com

Vsph boiler sequence of operation – Slant/Fin VSPH-180 User Manual

Page 21

background image

V

ICTORY VSPH Models

21

THERMOSTAT CALLS FOR HEAT

CIRCULATOR ON

INDUCER (BLOWER) ON

VSPH BOILER SEQUENCE OF OPERATION

BOILER WATER TEMPERATURE IS

BELOW HIGH LIMIT SETTING?

PRESSURE SWITCH CONTACTS PROVED

OPEN WITHIN 45 SECONDS?

PRESSURE SWITCH CONTACTS CLOSED

WITHIN 5 MINUTES?

30 SECONDS PRE-PURGE PERIOD

TRIAL FOR IGNITION-15 SECONDS

PILOT VALVE OPENS. IGNITION SPARK STARTS.

PILOT LIGHTS AND FLAME IS SENSED

DURING TRIAL FOR IGNITION?

SPARK OFF. MAIN VALVE OPENS. BOILER HEATING PERIOD

STARTS

CONTROL CONTINUOUSLY MONITORS THERMOSTAT, HIGH

LIMIT, PRESSURE SWITCH AND FLAME SENSOR.

THERMOSTAT CALLS FOR HEAT ENDS.

CIRCULATOR OFF, PILOT AND MAIN VALVE CLOSE.

15 SECONDS POST PURGE

BOILER WAITS FOR NEXT CALL FOR HEAT.

CONTROL LOCKOUT

FLAME LED FLASHING.

1/2 HOUR WAIT PERIOD

PILOT LIGHTS AND

FLAME SENSED?

4 TIMES RE-TRIALS

FOR IGNITION

CONTROL RE-INSTATE

TRIAL FOR IGNITION

WITH 30 SECONDS

INTER-PURGE

CONTROL LOCKOUT.

POWER AND

PRESSURE

SWITCH LED’S

FLASHING.

1 HOUR WAIT

PERIOD.

NO

YES

NO

YES

YES

YES

YES

NO

NO

NO

This manual is related to the following products: