Power source, Cleaning, Installation (continued) – Shellab SRI20P User Manual
Page 15

.
15 |
P a g e
INSTALLATION (CONTINUED)
3. Repeat the process on the opposite side of the chamber with the second sliding mounting
bracket.
4. Hang 1 shelf from the 2 installed sliding mounting brackets.
P
OWER
S
OURCE
Check the data plate for voltage and ampere requirements before making a connection. If the
requirements match your power source, plug the power cord into an earth grounded outlet. These units
are provided with a 100
– 120V 9ft, 5 in (2.86m), Nema 5-15P power cord. Supplied voltage must not
vary more than 10% from the data plate rating. Damage to the incubator may result if supplied
voltage varies more than 10%.
These incubators are intended for a 50/60 Hz application. Use a separate circuit to prevent loss of
product due to overloading or circuit failure.
Note: Electrical supply to the incubator must conform to all national and local electrical codes.
C
LEANING
The incubator interior was cleaned at the factory but not sterilized. See the
Maintenance section for more information