Shelving installation, Installation (continued) – Shellab SRI20P User Manual
Page 12

12 |
P a g e
INSTALLATION (CONTINUED)
S
HELVING
I
NSTALLATION
SRI3P Shelf Installation
Perform the following steps to install the SRI3P
incubator’s wire basket shelves:
1. Install the shelf clips in the slots located on the sides of the chamber interior, front and back.
2. Squeeze each clip, insert the top tab first, and then the bottom tab using a rocking motion.
3. Hang the wire shelves from the clips.
Figure 2: SRI3P Shelving Clips
See also other documents in the category Shellab Equipment:
- BACTRON300 (70 pages)
- BACTRONEZ (65 pages)
- BACTROX (32 pages)
- SCO2W (25 pages)
- SCO26H (21 pages)
- SCO6AD (47 pages)
- SCO5A (21 pages)
- SCO6WE (26 pages)
- SCO58 (40 pages)
- SCO5W (27 pages)
- SRI6PF (30 pages)
- SHC10 (27 pages)
- SHO1 (18 pages)
- 74300-706 (20 pages)
- SMI31 (20 pages)
- SMI4E (14 pages)
- SMI2 (19 pages)
- SMI1EM (14 pages)
- SMI1E (17 pages)
- SMO5HP-2 (28 pages)
- SMO3 (17 pages)
- SMO1E (21 pages)
- SMO14HP-2 (19 pages)
- SGO1E (21 pages)
- SGO3 (17 pages)
- SMO10HP-2 (20 pages)
- SGO5 (16 pages)
- SMO14-2 (26 pages)
- SMO5CR-2 (31 pages)
- SRI3 (14 pages)
- SRI21F (18 pages)
- SRI21D (22 pages)
- SRI20 (15 pages)
- SSI5R-HS (22 pages)
- SSI2 (20 pages)
- SSI5 (26 pages)
- SSI3 (15 pages)
- SSI10 (28 pages)
- SWBR17 (24 pages)
- SVAC1 (31 pages)
- SVAC1E (18 pages)
- SWBC22 (18 pages)
- SWB2 (29 pages)
- SWB30 (18 pages)