Shelving installation, Installation (continued) – Shellab SCO31 User Manual
Page 14

14 |
P a g e
INSTALLATION (CONTINUED)
S
HELVING
I
NSTALLATION
Shelves should be installed evenly spaced in the incubation chamber to obtain the best
temperature uniformity.
For ease of installation, Sheldon Manufacturing recommends that two people lift and
install each shelf in the SCO58 Incubator.
1. Squeeze each shelf clip when installing. Insert the top tab first into shelf
mounting standard, and then the bottom tab using a rocking motion.
a. SCO58, install six (6) clips for each shelf. Two (2) each on the left,
right, and back walls of the incubation chamber.
b. SCO40, SCO31, install four (4) clips for each shelf. Two on the left
wall and two on the right wall of the incubation chamber.
2. Hang the shelf on the clip with the shelf front nearest the chamber door.