Troubleshooting guide – Reznor VPS Unit Installation Manual User Manual
Page 38
38
6. Troubleshooting Guide.
START
Ensure gas & electricity
supplies are enabled.
Turn any external timer
to call for heat (if fitted).
Does the Power On
light illuminate?
NO
YES
Set thermostat to call for
heat at maximum setting
NO
YES
CHECK: -
1. Operation of any timer or control.
2. External fuses.
3. Supply Voltage is 120VAC 60Hz
Is there power to the
burner?
CHECK: -
1. Transformer
2. Integrity of wiring connections.
3. Light.
Does the fan run?
NO
YES
CHECK: -
1. Voltage supply to fan terminal 120VAC 60Hz
2. Integrity of wiring connections.
3. Fan.
Do the amber
lights illuminate after a
purge period?
NO
Is there power to
the fan?
YES
NO
CHECK: -
1. Integrity of wiring connections.
2. Pressure switch operation.
3. Ignition controller.
4. Transformer.
Does the Pressure
switch close?
YES
NO
CHECK: -
1. Pressure switch wiring connections.
4. Integrity of wiring connections.
5. Amber lights.
6. Ignition controller.
5. Transformer
CHECK: -
1. Hose connection to Pressure switch.
2. Air inlet, outlet, and emitter tubes for obstructions.
3. Pressure switch operation.
4. Supply voltage 120VAC / 60Hz
5. Transformer.
6. Ignition Controller.
YES
- UDAP Unit Installation Manual (40 pages)
- UDBP Unit Installation Manual (44 pages)
- UEAS Unit Installation Manual (44 pages)
- VPT Unit Installation Manual (40 pages)
- VCS Unit Installation Manual (48 pages)
- CAUA Unit Installation Manual (44 pages)
- EEDU Unit Installation Manual (32 pages)
- LDAP Unit Installation Manual (44 pages)
- MASA Unit Installation Manual (40 pages)
- RDF Unit Installation Manual (28 pages)
- RPB Unit Installation Manual (40 pages)
- SC Duct Furnace Unit Installation Manual (40 pages)
- SSCBL Unit Installation Manual (60 pages)
- X Unit Installation Manual (32 pages)
- ZQYRA Unit Installation Manual (72 pages)
- ADF Unit Installation Manual (28 pages)
- F Unit Installation Manual (40 pages)
- PDH (Indoor PreevA) Unit Installation Manual (72 pages)
- MAPSIII Unit Installation Manual (76 pages)
- RDH (Outdoor PreevA) Unit Installation Manual (68 pages)
- RP (Outdoor Duct Furnaces) Unit Installation Manual (32 pages)
- YDHA Unit Installation Manual (76 pages)
- OH Unit Installation Manual (28 pages)
- RBL (Cabinet Blower) Unit Installation Manual (12 pages)
- REC (Evaporative Cooling) Unit Installation Manual (12 pages)
- RIHN Unit Installation Manual (20 pages)
- UDAP Option - Installation - Power Venting (12 pages)
- UDAS Option - Installation - Separated Combustion Venting (16 pages)
- WS Unit Installation Manual (15 pages)
- EBHB Option - Installation - Thermostat Kit (2 pages)
- EFMA Unit Installation Manual (27 pages)
- EWHB Unit Installation Manual (9 pages)
- EXUB Unit Installation Manual (16 pages)
- XAWS Unit Installation Manual (12 pages)
- XAWU Unit Installation Manual (12 pages)
- XBWU Unit Installation Manual (12 pages)
- MAPS III Option - Installation - Energy Recovery Module Installation (12 pages)
- UDAP in sizes 30 through 125 Option - Installation - Ceiling Suspension Kit (2 pages)
- UEAS Option - Installation - Downturn Nozzles - V3 (4 pages)
- UDBP Option - Installation - Polytube Adapter Instructions (4 pages)
- UDBS Option - Installation - Vertical Louvers - V3 Series (2 pages)
- B Option - Installation - Blower/Filter Cabinet (4 pages)
- PDH with 1-stage gas control or 2-stage gas control Gas Conversion Kit Instructions (8 pages)
- VP series infrared heaters High altitude conversion instructions (12 pages)