Boom function test, Boom function test – results – NORAC UC5-BC-AGCO-RMC User Manual
Page 40
40 |
5.4. Boom Function Test
1. Navigate to the “Boom Movements” screen in the diagnostic menu (Run Screen-> Settings-> Next->
Diagnostics-> Boom Movements).
2. Press and hold the “Left Up” boom function on the display.
3. Ensure the “Left Up” boom function operates.
4. Repeat steps 1 to 3 for all the other boom functions: “Left Down”, “Right Up”, “Right Down”, “Main
Up”, “Main Down”, “Roll Clockwise” and “Roll Counter Clockwise”.
5.4.1. Boom Function Test – Results
5.4.1.1. Proportional function does not move, or wrong one moves:
Ensure the bypass (jam) valve is being activated. Try pressing an unfold function at the
same time to see if the boom function moves.
Test the valve module drivers. This tests the electrical portion.
Ensure the outputs are correctly configured.
Perform a manual valve override test. This tests the hydraulic portion.
Ensure the hydraulics are engaged.
Check the hydraulics installation. The raise lines must be connected to the “B” ports
and the lower lines must be connected to the “A” ports.