beautypg.com

NORAC UC4+BC+HD4 Part 1 User Manual

Page 28

background image

24

Use the dimensioned drawing below as a guide
for drilling the valve block mounting holes for
the LPZ boom. Drill holes large enough to
accommodate 3/8” bolts.

Y = 111.1mm (4.375 in)

X = 82.5mm (3.25 in)

See Section 7 for a drilling stencil.

Figure 27: NORAC Valve Block Mounting Hole Dimensions