beautypg.com

Waverley trellis pg4 – New England Arbors VA68205 User Manual

Page 4

background image

4

3605 32nd St. Building 3, Port Huron MI USA 48060

Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286

www.newenglandarbors.com

S T E P T H R E E

Complete the trellis assembly by fastening the last four

screws through the post caps onto the posts.

6

A

B

C

Install Trellis into Ground

Move the trellis to its final location. When you are satisfied

with the location, mark the positions of the posts, then move

the trellis aside and carefully lay it on its side. Excavate the

two posts holes approximately 10” deep x 3” diameter.

Carefully move the trellis back into position.

Level it both vertically and horizontally into the excavated

holes.

Backfill the holes with the excavated soil.

Optional: for a sturdier installation, pour concrete into the

excavated holes to hold the posts in place.

www.newenglandarbors.com

6

A

2

Level

3“

B

10”

C