New England Arbors VA68103 User Manual
The livingston arbor, Check box for these contents, Tools you will need
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346, ext #20 (Mon. to Fri. 8:00 AM to 4:00 PM EST).
1. Arch Keystone & Lid (2)
2. Keystone Bottom Plate (2)
3. Arches (4)
4. Arch Rafters (8) 7/8” x 1 1/2“ x 21.82”
5. Post Caps (4)
6. Posts (4) 2” x 3 1/2“ x 65.8”
7. Side Panel Horizontal Rails (4) 1 1/2” x 1 1/2“ x 23.75”
8. Lattice (2)
9. Hardware (in plastic bag)
a)
1 1/2” Self-Auguring Screws (16 for Arch to Posts & Keystones)
b)
3” Self-Auguring Screws (16 for Side Panels, 8 for ground stakes)
Tools You Will Need
• Cordless Drill
• Hammer
• Tape Measure
• Level
• Stool or Short Ladder
• Shovel
General Information
• Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
• We recommend an area approx 10’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling components.
The Livingston Arbor
Please read through before starting assembly.
10. Ground Stakes
(4) 1 3/4” x 1 3/4” x 15”
A S S E M B LY I N S T R U C T I O N S
8
6
1
www.edenarbors.com
5
4
3
1
9
a
Not to Scale
10
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
2
b
91.6 in.
232.7 cm.
42 in.
106.7 cm.
49 in.
124.5 cm.
20 in.
50.8 cm.
24 in.
61 cm.
Ver 1/2009
7