New England Arbors VA80140 User Manual
Scps.pvoujoh4ztufn, Fofsbm*ogpsnbujpo, 5ppmt3frvjsfe
Materials Include:
*OTUBMMBUJPO.PVOUJOH*OTUSVDUJPOT
"SCPS.PVOUJOH4ZTUFN
1. Read instructions carefully before assembling.
2. Identify each component from material list.
3. In the event of missing or defective parts,
Please call our customer service department
At 1-800-282-9346 (ex.#20).
(FOFSBM*OGPSNBUJPO
1. Cordless Drill
2. Spirit Level
3. Tape Measure
5PPMT3FRVJSFE
4 Galvanized Steel Surface Mounts
4 Plastic Mounting Sleeves
4 Locking Plugs /or/ Bolt & Wing Nut
4 White Stainless Screws
16 Tapcon Screws with Drill Bit
3
1
2
(SPVOE.PVOU
4VSGBDF.PVOU
Materials Include:
4 Galvanized Steel Ground Augers
4 Plastic Mounting Sleeves
4 Locking Plugs /or/ Bolt & Wing Nut
4 White Stainless Screws
1 Steel Turning Rod
Refer to your arbor instructions
for exact dimensions between
posts. Measure out and mark on
the ground each post location.
Double check your spacing
before continuing.
Turn the auger using the turning
rod and apply even downward
pressure. For dry or hard ground,
use water to soften the ground
first.
As you turn the auger into the
ground, check with your level
to ensure it is straight. Do this
at least twice before you have
completely installed the mount.
"SCPS.PVOUJOH4ZTUFN
"SCPS.PVOUJOH4ZTUFN