New England Arbors VA68200 User Manual
The grande trellis

Check Box for These Contents
In the event of missing or defective parts please call our customer service
dept. at 1 800 282 9346, ext #20 (Mon. to Fri. 8:00 AM to 4:00 PM EST).
1. Arched Top Rail (1)
2. Post Caps (2)
3. Posts (2)
4. Vertical Spindles (7)
5. Horizontal Spindles (5)
6. Bottom Rail (1)
7. Ground Anchoring Stakes (2)
8. 3/4” Self-Auguring Stainless Steel Screw (25)
Tools You Will Need
• Cordless Drill
• Hammer
• Tape Measure
• Level
• Shovel
General Information
• Read Instructions through carefully before beginning assembly.
• When assembling components, place on a non-abrasive surface
(i.e. shipping box)
to avoid scratching.
• We recommend an area approx 5’x 8’ for unobstructed assembling.
• You should not need to use excessive force when assembling component.
The Grande Trellis
Please read through before starting assembly.
A S S E M B LY I N S T R U C T I O N S
1
www.edenarbors.com
1
2
8
Not to Scale
6
3
4
5
IMPORTANT: CHECK THE INSIDE OF YOUR POSTS FOR ALL MATERIALS.
Ver 1/May 2011
7
47 in
54 in
3 in
87.38 in
91 in
2 in