beautypg.com

Connect the arch system to the side panels, Fill excavated holes – New England Arbors VA84250 User Manual

Page 5

background image

S T E P F O U R

Temporarily position post caps on bottoms of arches.

With a helper, insert the bottom of the arches into the
posts until the arch rest on the stopper bolts.

Slide post caps down into position.

Install 2 - 1 1/2” screws into the two pre-drilled holes per posts.

Connect the Arch System

to the Side Panels

1

2

www.newenglandarbors.com

S T E P F I V E

Ensure that posts and side panels are level.

Fill around the posts with wet cement within 3 in. (7.6 cm.)
of your natural elevation.

Complete a final level check both horizontally and vertically.
and backfill the remaining space between concrete and
natural elevation with topsoil.

Fill Excavated Holes

1

2

3

5

1915 Dove St., Port Huron MI USA 48060

Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286

www.newenglandarbors.com

1

1

4

3

3

4

2

3

Level

2

3 in.

7.6 cm.

3

Level