Assemble the pergola top, The monaco arbor – New England Arbors VA68122 User Manual
Page 2
1
S T E P O N E
2
Slide the keystone body over the pergola beam to about the mid
point. Repeat for other pergola beam.
Install the four pre-drilled pergola rafters using 2 1/2” self augering
screws starting with the one furthest from the keystone (rafter
locations are marked with pre-drilled holes on the pergola
beams to give you guidance for spacing). Ensure that the pergola
beams are oriented properly as per illustration.
Identify the mid-point on the pergola beam and position keystone.
To prevent the keystone from shifting position, install two screws
into the beam on either side of the inside of the keystone.
Install the lid on the keystone. Ensure lid is locked into place
by pushing firmly down.
The Monaco Arbor
Assemble the Pergola Top
1
1
3
2
www.edenarbors.com
Layout the horizontal bottom rail and insert the two long
vertical spindles. Ensure the routed holes on the spindles are
orientated correctly to eventually receive diamonds (see Figure 1)
The spindles are identified inside the notch at the top with either
the letter L for Left or R for Right.
Install the arched top rail over the ends of the vertical splindles
ensuring the architectural detail faces out (same as bottom rail).
Insert the four horizontal rails ensuring that the routed holes on
the spindles are positioned to eventually accept the diamonds
(see Figure 2).
Set out one post and complete the side panel by inserting it into
the post. Start with the bent top rail first.
Lay out the second post with holes facing upwards and insert
the completed panel and connected post.
Repeat for other side panel to complete both side panels.
1
2
3
4
S T E P T W O
Assemble the Side Panels
5
6
2
2
3
5
6
NOTE: Some of the horizontal rails have locking tabs located
at both ends. Once inserted and pushed into the routered
holes, they will lock into place.
Fig. 1
3
4
4
R
L
L
R
Holes
Fig. 2
Insert 1st
Insert 2nd
Insert 3rd
R