beautypg.com

Mpg370 bow & stern lines (master), Malone, Mpg370 bow & stern line kit – Malone MPG106MD User Manual

Page 5: Attach hook to rope (steps a-d)

background image

MPG370 BOW & STERN LINE KIT

MALONE

R

Thread free end

of cord through

hook.

Create a “left

over right”

knot & tighten.

Create a “right

over left”

knot & tighten.

Pull to test for

knot strength.

A

B

C

D

Attach hook to rope (steps A-D)

Keeping the rope tight and

S-hook in place, thread the

free end up and through a

strong point on the kayak

F

Make a loop in the rope

12” to 14” away

from the kayak or canoe.

G

Attach and dress rope to vehicle and boat (steps E-O)

Attach S-hook to vehicle

tow ring or other sturdy

body part.

E

Bend the loop over leaving

a large opening as shown.

H

Opening

Pass the loop through the

opening.

I

Pull to create a tight knot.

J

K

Thread the free end of

the rope

through the loop.

L

Pull the free end up until

the rope

is sufficiently tight.

M

Hold the rope secure with

one hand.

Form a knot with the free

end and tighten. Form

a second knot for

safety purposes.

N

The line should be tight

and secure. Repeat for

second tie-down.

O

MALONE AUTO RACKS, 81 County Road, Westbrook, Maine 04092

Phone: 207-774-9100 Fax: 207-615-0551

Website: www.maloneautoracks.com Email: [email protected]