Mpg109md instructions 4, Malone, Installation & loading instructions – Malone MPG110MD User Manual
Page 4
MALONE
R
Installation & Loading Instructions
Step 2: Loading & Securing the Kayak
. Dress the free end of the strap under the cross bar in front of the Jawz
mounting hardware. See image 15.
. Pull the free end until both ends are even and a loop is created.
See image 16.
. Place the strap loop over the kayak. See image 17.
Note: Confirm that the strap remains tight under the cross bar and in
front of the Jawz hardware.
. With the loop placed over the kayak, pull the free end down until the
buckle end of the strap is positioned on the top edge of the kayak.
See image 18.
15
16
17
18
TM
TM