Mpg109md instructions 2, Malone, Installation & loading instructions – Malone MPG110MD User Manual
Page 2
5
T-knob
MALONE
R
Installation & Loading Instructions
Step 1: Installing the Carriers onto the Cross Bars
. Evenly apply T-knobs to bolts and slightly tighten until the carrier is secure
on the cross bar. See image 5.
. Install the second carrier using the same procedure (steps 1-5). See image 6.
Note: Confirm that both carriers are installed so that the rounded side of each
base is facing outward (towards the edge of the vehicle’s roof).
6
9
Mounting
Bolt
7
8
For MPG109MD-F: Installation complete. (
Additional carriers (MPG109MD-F or MPG109MD-R) are required for transport.)
For MPG109MD-R: Begin installation (steps 7-11).
For MPG110MD: Continue installation (steps 7-20).
. Insert a mounting bolt into the right side hex hole. See image 7.
. Insert mounting bolt through one hole of a Jawz adapter and loosely
apply T-knob. See image 8.
. Place the carrier onto the rear cross bar with the bottom rounded side
towards the outside of the vehicle. Swing the Jawz under the cross rail
as shown. See image 9.
T-knob
Jawz
Outside
Edge
TM
TM