beautypg.com

Mpg109md instructions 3, Malone, Installation & loading instructions – Malone MPG110MD User Manual

Page 3

background image

10

MALONE

R

Installation & Loading Instructions

Step 1: Installing the Carriers onto the Cross Rails

. Insert a mounting bolt into the left side hex hole and down through the Jawz

adapter and evenly tighten T-knobs until carrier is firmly seated on the rear

cross bar. See image 10.

. Install the second carrier using same procedure (steps 7-10). See image 11.

Note: Confirm that both carriers are installed so that the rounded side of each

base is facing outward (towards the closest edge of the vehicle’s roof).

Step 2: Loading & Securing the Kayak

. Both front & rear carriers should now be installed. See image 12.

. Position the kayak at the rear of the vehicle. Lift the front of the kayak up and

place into the rear carriers. See image 13.

Note: To avoid damaging the vehicle and kayak, place some type of protective

material on the rear of the vehicle.

. Push the kayak forward until it is centered on the front and rear carriers. See

image 14.

Adjust all four carriers to achieve maximum hull contact. Securely tighten

all of the T-knobs after final kayak to carrier positioning.

Roof

Edge

11

Mounting

Bolt

13

14

12

For MPG109MD-R: Installation complete. Additional carriers (MPG109MD-F) are required for transport.

For MPG110MD: Continue instructions on Loading & Securing the Kayak (steps 12-20).

Front

Rear

TM