0 board installation, 0 connecting wires - removing a terminal block, Sb-293 satellite board – Keri Systems SB-293 Quick Start User Manual
Page 3: Sb-293 quick start guide
SB-293 Satellite Board
1530 Old Oakland Road, Suite 100
01837-003 Rev. 2.3
San Jose, CA 95112 USA
(800) 260-5265 (408) 451-2520 FAX (408) 441-0309
Web: http://www.kerisys.com E-mail: [email protected]
Page 3 of 16
SB-293
Quick Start Guide
5.0
Board Installation
Perform the following steps to install an SB-293 Satellite board on a PXL-250 controller (see Figure 2).
1. Turn the controller's power OFF.
2. Line up the upper left-hand corner of the Satellite PCB with the controller PCB.
3. Line up the stand-offs in the top two corners of the Satellite PCB with corresponding mounting holes in the
controller PCB (see Figure 2).
4. Align the Satellite Board to Motherboard connector pins (J2 and J3).
5. Gently press the two boards together with each stand-off into its mounting hole and with the connector pins
meshing together.
6. Turn the controller’s power ON.
If the J2 to P2 connector pins have been meshed together properly the LED on the SB-293 turns green (see Figure 4 on
page 4).
Figure 2: Stand-off Installation
6.0
Connecting Wires - Removing a Terminal Block
Figure 3: Connecting Wires to Terminal Blocks