beautypg.com

Installation steps, Installation steps 14 – Interlogix DSGH Series User Manual

Page 18

background image

Chapter 3: Application

14

GE-DSG-8 DSGH-5 and 8 Ethernet Switch User Manual

Installation Steps

1. Unpack the Industrial Gigabit Ethernet Switch.
2. Check the DIN-Rail is screwed on the Industrial Gigabit Ethernet Switch. (Please

refer to DIN-Rail Mounting section for DIN-Rail installation. If the DIN-Rail is not
screwed on the Industrial Gigabit Ethernet Switch.). If you want to wall mount the
Industrial Gigabit Ethernet Switch, then please refer to Wall Mount Plate Mounting
section for wall mount plate installation.

3. To hang the Industrial Gigabit Ethernet Switch on the DIN-Rail track or wall, please

refer to the Mounting Installation section.

4. Power on the Industrial Gigabit Ethernet Switch. (Please refer to the Wiring the

Power Inputs section for power input) The power LED on the Industrial Gigabit
Ethernet Switch will light up. Please refer to the LED Indicators section for
meaning of LED lights.

5. Prepare the twisted-pair, straight through Category 5 cable for Ethernet

connection.

6. Insert one side of Category 5 cables into the Industrial Gigabit Ethernet Switch

Ethernet port (RJ-45 port) and another side of category 5 cables to the network
devices' Ethernet port (RJ-45 port), ex: Switch, PC or Server. The UTP port (RJ-45)
LED on the Industrial Gigabit Ethernet Switch will light up when the cable
connected with the network device. Please refer to the LED Indicators section for
LED light meaning.

Note:

Be sure the connected network devices support MDI/MDI-X. If it does not

support then use the crossover category 5 Cable.
7. When all connections are all set and LED lights all show normal, the installation is

complete.

This manual is related to the following products: