Parts & assembly sheet – Golden Lighting 8118-SF PW User Manual
Page 2

NOTE: INSTALL THE GLASS ASSEMBLY AFTER
THE FIXTURE IS HUNG.
Complete the steps 1~3 as in Fig. 1 (ASSEMBLING
THE FIXTURE as Semi-flush)
For Customer Service, contact the place of purchase to arrange for replacement parts.
PARTS & ASSEMBLY SHEET
Fixture Name: Alston Place 8118-SF BUS
ASSEMBLING THE FIXTURE as Chain hung
(Fig. 2)
1. Remove the circular strap from top of fixture.
Replace the long mounting screws with two short
screws to hold the Deco Nuts (E) in place on the
fixture Top Cap (D).
2. Feed the fixture wires through the Top Loop (F)
and pull the wires until taut. Then screw the Top
Loop (F) to the coupling on the top of fixture until
tight.
3. By measuring, determine correct number of links
needed for proper hanging height. Use a pair of
pliers to open one link of the Chain (C2) then
remove the excess Chain (C2) and discard it.
4. Use a chain connector (E2) to attach one end of
the chain to the Top loop (F) and close the chain
connector.
5. Feed the fixture wires through the chain (every
three links) and pull the wires until taut.
6. Slip Canopy Loop Collar (B2) over the chain,
then do the same with the canopy (F2).
7. When ready to complete the installation Use the
other chain connector and attach the other end of
the chain to the canopy loop (A2) and close the
chain connector.
8. Make sure the weight of the chandelier is
supported by the chain - not the electrical wire.
* You may now hang the fixture
Fig. 2
B2
D
A2
F2
E
F
C2
E2