beautypg.com

CyberPower Systems PowerPanel Power Supply System User Manual

Page 19

background image

PowerPanel

®

Business Edition

Copyright © 2006-2007 Cyber Power Systems, Inc. All rights reserved.

18

overloaded

Battery-test failure

The battery-test failed to provide battery power normally.

Batteries are not
present

Batteries are not present; the Battery Backup cannot
provide battery power in this condition.

Batteries need to be
replaced

Batteries may not work well any more; they need to be
replaced with new ones.

Communication lost

Communication with device has been lost.

Communication
cannot establish

Communication cannot establish during startup.

Information

Remaining runtime
is insufficient

This event will occur when the battery is fully charged
and the remaining runtime is still less than sum of times
set in the following categories:

Event Utility power failure and Low Battery

shutdown action delay time.

Event Shutdown is initiated command file

execution time.

OS shutdown time.

All connected Slave OS shutdown time.

Plus an additional 30 seconds.

You need to unload some equipment connected to

the Battery Backup to get more remaining runtime.

Please make sure all connected equipment will have

enough remaining runtime when power problem
occurs.

Shutdown initiated

Shutdown process initiated.

A schedule has
initiated

A schedule has initiated, the system could be shutdown.
This event occurs when any one of following things
happens:

The schedule setup controlled outlet to Whole

outlet.

The Battery Backup support standalone outlet

control and the schedule setup controlled outlet to
Outlet#1 or Outlet2 and enable Shutdown OS.

Enters bypass mode

Enters bypass mode for power supply, battery power will
no longer be provided.