Kenmore 385. 17622 User Manual
Page 11
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
SECTION 2. PREPARE THE MACHINE FOR SEWING
Prepare the Bobbin
• To Remove the Bobbin Case from the Machine
the machine by pulling it to the
left. Open the shuttle cover by
pulling down the embossed part on
the left side of the cover.
Raise needle to its highest position
by rotating hand wheel toward you.
tie, pull open latch of bobbin case.
Pull bobbin case straight out of
shuttle.
* Wind the Bobbin
bobbin.