Carl Goldberg GBGP0102 User Manual
Page 8

8
16. Fit your 12V lead-acid battery in place. Use folded-up
pieces of latex foam to cushion the battery and keep it from
sliding around. Install the battery cover.
17. Install the handle using two 20mm pan-head phillips
sheet metal screws and two 1" [25.4mm] O.D. large-area
washers. Remove the screws and harden the screw holes
with thin CA. Reinstall the screws and washers.
BUILD THE DRAWERS
1. Set the drawer base (part #27) on a flat surface. If
the base is slightly warped, use a weighted bag to hold it
flat as you build. Glue one drawer side (part #24) to the left
side of the base so that the side sits atop the base. Tape it
in position. Glue the drawer back (part #25) to the side and
base. Tape everything together and set the drawer on a flat
surface. Place a weighted bag (or bags) on the base and
use a builder’s triangle or a builder’s square to make sure
everything is square. Note: Both drawers are identical.
2. Glue the drawer front (part #25 again) and the other
drawer side (part #24) to the base. Tape all of the joints
tightly together. Flip the box over and set weight on the