Carl Goldberg GBGP0102 User Manual
Page 5
5
8. Place three pieces of tape under the top tray floor.
9. Glue the front panel (part #22) in place so that the
bottom edge of the panel sits flush with the bottom face
of the top tray floor. Use a 24" [610mm] bar clamp to hold
everything in alignment as the glue dries. If you do not have
a bar clamp, you may use long pieces of masking tape.
Remove the clamps and tape after the glue is dry.
10. Glue the two fuel tank tray gussets (part #9) in the
locations shown. Align each gusset so that it is flush with the
edge of the base and upright. Note: The tall side of the gusset
is glued to the upright. Place a drop of thick CA on the back
side of the gussets at the horizontal joint and the vertical joint to
hold the gusset tightly up against the corner as the glue dries.
BUILD THE BATTERY BOX
1. Apply two pieces of tape from underneath the base.
2. Glue one battery box side (part #2) to the base and
the left side upright so that the edges sit along the top face
of the base and the left face of the upright. Tape the battery
box side securely to the base and upright. Remove the tape
after the glue dries.
3. Glue one 5/16" x 5/16" x 5-3/4" [8x8x146mm]
hardwood stick to the battery box side so that the edge of
the stick sits flush with the edge of the battery box side.
Glue one piece of 5/16" x 5/16" x 3" triangle stock in the
fillet between the battery box side and the base.
4. Repeat steps 1 through 3 for the other battery box side.