Installation – AERCO Boiler Valve Controller (BVC) PRIOR to Serial-12-840-1 User Manual
Page 11

INSTALLATION
11
Figure 2 - Mounting Foot Kit
Figure 3 - Attached Mounting Foot
.
3. After all four feet are attached, position the Boiler Valve Controller on the wall-mounted
plywood sheet or other suitable surface. For easy viewing, position the BVC so that the LCD
display is at eye level.
4. Mark the locations for the four slotted holes in the mounting feet.
5. Remove the BVC and drill four (4) pilot holes for the mounting screws.
6. Secure the BVC to the wall using four (4) screws (not supplied) suitable for the mounting
surface being used. The size of the screws required is to be determined in the field .Do not
over-tighten the screws.
2.3.2
Drilling Access Holes for Conduit and Cable Connections
Since the BVC does not come pre-drilled, access holes must be made to accommodate all
incoming/out-going signaling and power wiring. Power wiring should be routed through a
separate cutout to minimize electrical noise on signal leads. Access holes can be drilled in the
bottom (preferred), top, or side surfaces of the enclosure. The most common method for drilling
holes in the composite fiberglass enclosure is using a standard twist bit drill. For best results,
AERCO recommends that carbide tipped or PCD diamond tipped tools be used to avoid
chipping of the composite material. AERCO recommends that hubs be used for connecting
conduit and cabling to the enclosure.