This section provides the descriptions and procedures necessary to mount the Boiler Valve

Controller and connect them to all boiler plant units and related MOVs. Refer to the appropriate

wiring diagrams provided in Figure 8 when making all wiring connections between the Boiler

Valve Controller, AERCO boilers, and their associated MOVs.

2.2

9B

SITE SELECTION

Ensure that the site selected for installation of the Boiler Valve Controller provides the following:

Access to single-phase AC power at 120 VAC, 60 Hz.

Sufficient clearances to permit maintenance and setup/operational tasks on the Boiler

Valve Controller. The BVC enclosure should be mounted with
1. A minimum of three feet in front of the enclosure free
2. The ability to open the front cover all of the way

Always refer to local codes to insure compliance when installing and maintaining your BVC

unit.

2.3

10B

PREPARING & MOUNTING THE BVC

AERCO recommends that the BVC be wall-mounted using a sheet of plywood or other suitable

material. However, prior to mounting, access holes must be drilled in the laminated fiberglass

enclosure. Refer to section 2.3.1 and section 2.3.2 for guidelines and instructions for drilling

access holes and mounting the controller. Before any drilling and mounting of the box can be

performed it is important to carefully and safely remove and then re-install the cover.

2.3.1

18B

Mounting the Boiler Valve Controller Enclosure

Each controller is shipped with a Mounting Foot Kit which is included inside the enclosure. This

kit contains four (4) mounting brackets and four (4) 10-32 x 7/16” flat head screws (Figure 2).

The mounting feet are attached as follows:

1.

Place the mounting feet on the back side of the enclosure so that the counter sink hole is

directly over the brass insert.

2.

Using a screwdriver and the 10-32 x 7/16” flat head screws, tighten the mounting feet to the

enclosure. The torque should be approximately 25 in-lb. An attached foot appears in

3.

Figure 3 below.