Preparation before use, 1 filling the evaporation trap with water, 2 preparing the test liquid – A&D Weighing FX-300i-PT User Manual
Page 18
16
Test liquid cup
Insert the thermometer
into the cup so that the
clamp is hooked on the
edge of the cup.
Clamp
Thermometer
8. PREPARATION BEFORE USE
The measurement environment recommended by ISO 8655 is as follows.
Temperature: 15°C to 30°C ±0.5°C Humidity: Greater than 50% RH
8-1 Filling the Evaporation Trap with Water
Remove the evaporation trap from the balance. Separate the upper and lower part of the evaporation trap.
Pour water into the groove along the circumference of the inner wall of the lower part of the evaporation trap,
using a wash bottle or a pipette, up to the center between the two lines on the evaporation trap.
NOTE When pouring water, use much care not to spill water around the fitting boss of the
balance weighing pan.
Attach the upper part of the evaporation trap to the lower part and place the evaporation trap on the
balance or weighing unit.
It takes approximately 15 minutes for the humidity inside the evaporation trap to stabilize to about 85% RH.
The time required for the humidity to stabilize varies depending on the measurement environment.
8-2 Preparing the Test Liquid
Pour distilled water into the test liquid cup.
Place the thermometer in the cup, using the clamp as shown below.
Leave as is to allow the temperature of the distilled water to stabilize. ISO 8655 recommends that
the test liquid be acclimatized to the measurement environment for two hours or more.
Wash bottle
Water level
reference lines
Lower part of
the evaporation trap