Hangar 9 Piper J-3 Cub 40 ARF User Manual
Page 8
![background image](/manuals/657597/8/background.png)
8
Step 11
Cut a groove from the hole to the bottom of the rudder to
allow clearance for the tail gear bearing.
Step 12
Apply a thin layer of lubricant where the bearing will
ride in the rudder. Use 6-minute epoxy to glue the wire
into the rudder.
Step 13
Cut a slot in the end of the fuselage to accept the tail
gear bearing.
Step 14
Install three hinges into the rudder. Test fit the rudder
to the fuselage, sliding the hinges and tail wheel bracket
into position.
Step 15
Use 6-minute epoxy to glue the tail gear bearing into the
fuselage. Use thin CA for the hinges.
Section 1: Hinge Installation