Hangar 9 Piper J-3 Cub 40 ARF User Manual
Page 19
19
Step 17
Slide the 2
1
/
8
" piece of heat shrink over the wires and
dowel. Use a heat gun or lighter to shrink the tubing. Once
the tubing has been shrunk, apply thin CA to each end of
the shrink to complete this part of the pushrod assembly.
Step 18
Repeat Steps 13 through 17 for the opposite end of
the dowel, but only drill one hole and prepare one 6"
pushrod wire.
Step 19
Slide the elevator pushrod wire in position into the
fuselage. It may take some time to get it in, so be
patient. Slide a clevis retainer onto two clevises, and
then thread them onto the pushrod wires at the aft end
of the fuselage. This will prevent the pushrod wire from
falling out of the fuselage.
Step 20
Plug the necessary servo leads into the receiver. This
includes the switch harness and battery leads as well.
Install the flat radio foam into the fuselage, followed by the
die-cut foam. Place the receiver and battery into the foam.
Note: There is a tube located under the
elevator servo for the antenna wire. Route the
wire through this tube to the tail of the aircraft.
Step 21
Place the remaining flat radio foam over the receiver and
battery. Secure the foam to prevent the receiver and battery
from moving from their location. Mount the receiver
switch to the side of the fuselage.
Section 4: Servo Installation (Fuselage)