Assembly after a complete teardown – Cub Cadet ZD User Manual
Page 32

EZT
®
29
If the unit has been torn down completely, the
following summary identifies the assembly pro-
cedures necessary to completely assemble the
unit. Each assembly procedure is located by a
page reference.
The part reference numbers provided in each
assembly procedure are keyed to the individual
exploded views, and are also keyed to the com-
plete unit exploded view on page 30.
1. Install the hydraulic components. See
pages 24-28.
2. Install the input shaft and bypass rod. See
page 23.
3. Install the axle shaft, reduction gears and
expansion plate. See page 21.
4. Install the cog brake and side cover. See
page 18-20.
5. Fill the transaxle with new oil. See page 9.
6. Install the bypass arm and control arm.
See page 16.
7. Install the transaxle onto the vehicle.
8. Perform the purge procedures listed on
page 10.
assEMBlY afTEr a coMplETE TEardown