It can be difficult to immediately understand what kind of overload that is due, but it is
important to reduce the load as soon as the display flashes.
6:2 Use
6:2:1 Before Use
Check that the battery of the instrument is in good condition as per Low Battery Voltage
section 6:1:5.
Check that the threads of the tightening screw are clean and well lubricated.
ROCOL ASP grease or equal molybdenium disulphide grease is suitable.
6:2:2 Measuring Instructions
Unscrew the clamping jaw (1) by means of the tightening screw (2) enough to provide
space for the rope.
Install the RTM on the rope for good contact on the outer rope supports (3). Try not to
measure close to rope attachments etc.
Screw the clamping jaw (1) by hand to stop. The rope then should be tight to the
centre support (5) without being deformed.
6:2:3 After Use
Dirt in the threads of the tightening screw (2) must be removed. Lubricate if necessary.
Clean the instrument and check the battery condition.
Keep/carry the instrument in the transportation case provided.