beautypg.com

9 taking out of operation, 1 transport, 2 taking out of operation – BUCHI Ultrasonic Package User Manual

Page 37

background image

BÜCHI Labortechnik AG

Taking out of operation | 9

Ultrasonic Controller

37/46

9 Taking out of operation

9.1 Transport

Preliminary tasks

1.

Prepare the original packaging.

2.

Clean the Ultrasonic Generator.

• Make sure the device is free of any liquids and residues.

Tasks

1.

Disassemble the device in reverse order.

5.3 Damper, installation [

}

page 26]

5.2 Ultrasonic controller with nozzle, installation [

}

page 25]

2.

Put all relevant documentation e.g. operation manual into the packaging.

9.2 Taking out of operation

1.

Remove all liquids and residues.

• For device disposal in an environmentally friendly manner, make sure

that the components are separated and recycled correctly by a specialist
for disposal.

• For disposal of liquids and consumables such as catalyst or acid, see the

data sheets of these chemicals.

2.

Follow the valid regional and local laws concerning a disposal. For help,
please contact the local authorities.