Updx series, Blower temperature switch replacement – Bradford White UPDX2-75T6FRN User Manual
Page 24
UPDX SERVICE PROCEDURE V
Blower Temperature Switch Testing
and Replacement
Blower Temperature Switch
Replacement
WARNING
115 volt potential exposure. Use caution
to avoid personal injury.
Step 1.
Position gas control power switch to the “OFF”
position and unplug heater from wall outlet.
Step 2.
Remove the three screws (Phillips screw driver)
from the control access cover on blower and
remove cover (see photos 21 and 22).
22
Step 3.
Locate blower temperature switch (see photo 23).
Step 4.
Disconnect red and yellow wire leads from switch.
Step 5.
With an appropriate tool such as side cutters, snip the
retaining lug from the blower housing to allow removal of
temperature switch (see photo 24).
Step 6.
Remove switch from blower housing.
Step 7.
Install new switch. Be sure switch is properly seated in
mounting area.
Step 8.
Reconnect red and yellows wires to new switch. Wires are
interchangeable with either terminal.
Step 9.
Position gas control power switch to the “ON” position
and verify proper heater operation.
Step 10.
Replace control access cover from step 2.
Blower Temperature
Switch Location
23
Snip Retaining Lug
from Blower Housing
24
Page 24
UPDX Series
Gas Control shown in the “OFF”
Position
21
Control Access Cover
Screws
24