Updx series, Pressure switch testing – Bradford White UPDX2-75T6FRN User Manual
Page 19
UPDX SERVICE PROCEDURE III
Pressure Switch Testing and
Replacement
Pressure Switch Testing
WARNING
115 volt potential exposure. Use caution
making voltage checks to avoid personal injury.
Step 1.
Position gas control power switch
to the “OFF” position.
Step 2.
Remove the three screws (Phillips screw driver) from control access cover on blower assembly and
remove cover (see photos 1 and 2).
Step 3.
Carefully remove pressure switch from blower housing (see photo 3).
2
Use a multi-meter set to the
ohms setting. With blower off,
check across pressure
switch terminals.
Are switch contacts open
(no electrical continuity)?
Check tubing and pressure tap
on switch for blockage.
Is there blockage?
Replace switch
(see page 20).
Position gas valve power
switch to the “ON” position
and adjust thermostat
to call for heat,
this will start the blower.
Check with multi-meter, do
pressure switch contacts close
with blower running with the
switch in the vertical
postition?
With steps 1,2 & 3 complete,
disconnect wire leads from
pressure switch.
Y
N
Y
N
Switch contacts are OK.
See safety circuit trace
(page 33).
Is vent
system
Blocked?
N
See blower testing
(page 21)
Is blower OK?
Clear blockage.
Y
N
Y
N
Correct blower
problem.
Pressure Switch
Slide pressure switch in direction of
arrow while tilting slightly away
from blower housing.
Is vent system length
within vent table
specifications
listed on page 7.
Y
Reconfigure vent
system to be
compliant with
vent tables.
N
Y
Pressure Switch
Wire Leads
Page 19
Check tubing and
pressure tap on
switch for blockage.
Is there blockage?
N
Y
UPDX Series
1
3
Control Access
Cover Screws
4
Gas Control shown in the
“OFF” Position
Control Access
Cover
19