Inspection and Start-up Checklists

Receiving and Inspecting

 Unit received undamaged

Unit received complete as ordered including accessories

Handling and Installing

 Unit mounted on solid level surface

 Sufficient space allowed for access to unit and accessories



Proper electrical service

provided

 Hot water provided to humidifier

 Drain lines and trap installed properly

 Ductwork, fittings and grilles installed properly

 All cold duct surfaces insulated

 Low ambient control included if freezing condition present



No obstructions to air

flow to condenser

Starting-up the Unit

 General visual inspection looks good



All wiring connections checked

 All ducts, grilles and panels in place

 Start unit

 Check ducts and connections for air leaks

 Balance air distribution

 Confirm condenser airflow is unrestricted

 Verify cooling and heating operation

 Check for excessive noise or vibration

39