07_reliance, Reliance fabrication, Figure 6 – Oldcastle BuildingEnvelope Solar Shelf User Manual
Page 7: Figure 5
7
S U N C O N T R O L - I N S T A L L A T I O N M A N U A L
SOLAR ECLIPSE
™
FIGURE 6
Notch top of lower caps
and bottom of upper caps
as shown
.
612"
1
5
16
"
15
16
"
1
4"
R18"
15
16
"
\pxql;Drill 7/16" dia.
holes
(4) places
1
5
16
"
5
8"
212"
1 3
32"
5
16"
314"
Front
View
Side
View
Reliance Fabrication
FIGURE 5
Mill center of mullion tongue
for shade anchor
Centerline of
Sunshade Anchor
Centerline of
Sunshade Anchor
2.1 Fabrication
8) Locate the centerline of each sunshade anchor. A 1/4" wide x 6-1/2" long cutout must be
milled into face of mullion tongue as shown in upper detail of FIGURE 5. The standard
sunshade anchor (WW-107-01) for Reliance Curtain Wall will require (4) four 7/16" clear
holes for attachment. See FIGURE 5 for hole locations. ( Size, locations and quantity of bolts
may vary based on project requirements, consult engineer for specific applications.)
9) Face caps must be notched to clear anchor. Face caps are cut at centerline of sunshade,
notched on ends. Notch per FIGURE 6.
Installation Notes:
1) Face cap will be notched above and
below anchor. See FIGURE 6.
2) Slide cap over anchor and snap into
position.
3) Butt splice cap at centerline of
anchor.
Note: WW-110 face cap shown, notch
similar for custom applications.