PRODUCT USE
The SOLAR ECLIPSE and SOLAR SHELF sun control systems are intended for installation by
glazing professionals with appropriate experience. Subcontractors without experience should employ a
qualified person to provide field instructions and project management.
Variations from the details shown are not the responsibility of Oldcastle BuildingEnvelope
™
when
drawn by others. Oldcastle BuildingEnvelope
™
strongly encourages its customers to utilize Oldcastle
BuildingEnvelope
™
supplied calculations and shop drawings. Sun Control products must be reviewed
by an engineer for each project to ensure proper application.
Oldcastle BuildingEnvelope
™
does not control the application or selection of its product configurations,
sealant or glazing material and assumes no responsibility thereof. It is the responsibility of the owner,
architect and installer to make these selections in strict compliance with applicable laws and building
codes.
Consult sealant manufacturer for review and recommendation of sealant application. Follow sealant
manufacturer's recommendations and literature for proper installation.
PROTECTION AND STORAGE
Handle all material carefully. Do not drop from the truck. Stack with adequate separation so materials
do not rub together. Store material off the ground, protecting against the elements and other
construction hazards by using a well ventilated covering. Remove material from package if wet or
located in a damp area. For further guidelines consult AAMA publication " Care and Handling of
Architectural Aluminum from Shop to Site".
CHECK MATERIAL
Check all material upon arrival at job site for quality and to determine any shipping damage.
Using the contract documents, completely check the surrounding conditions that will receive your
material. Notify the general contractor by letter of any discrepancies before proceeding with the work.
Failure to do so constitutes acceptance of work by other trades.
Check shop drawings, installation instructions, architectural drawings and shipping list to become
familiar with the project. The shop drawings take precedence and include specific details for the
project. The installation instructions are of a general nature and cover the common conditions. Due to
varying job conditions all sealant used must be approved by the sealant manufacturer to insure it will
perform per the conditions shown on the instructions and shop drawings. The sealant must be
compatible with all surfaces in which adhesion is required, including other sealant surfaces. Use
primers where directed by sealant manufacturer. Properly store sealant at the recommended
temperatures and check sealant for remainder of shelf life before using.
FIELD CONDITIONS
All materials to be installed must be plumb, level and true. Aluminum to be placed in direct contact with
masonry or incompatible material should be isolated with a heavy coat of zinc chromate, bituminous
paint or non-metallic material.
CLEANING MATERIALS
Cement, plaster terrazzo, alkaline and acid based materials used to clean masonry is very harmful to
finishes. Any residue should be removed with water and mild soap immediately or permanent staining
will occur. A spot test is recommended before cleaning agent is used. Refer to Architectural Finish
Guide in the Detail Catalog.