EFCO 8800 Series Assembly Instructions Vol.4 User Manual
Page 36

EFCO 2009
Page 36
Series 8700 / 8800 Unitized Curtain Wall Assembly Instructions - Volume 4
Figure 67
5. Remove the temporary glazing retainers.
6. Apply structural silicone sealant into the void between the glass and mullion per the sealant manufacturer’s application instructions. Frames should not be
moved until the sealant has cured and per the sealant manufacturer’s recommendations.
7. Refer to Volume 2, page 21 and 22 of the S-8000 Unitized Curtain Wall Assembly Instructions for glazing instructions, details and notes.
Section 14 - Inside 90° Corner Captured Unit Glazing : B. Setting and Caulking Glazing
Apply Structural
silicone
Pack sealant
into joint
HEAD
SILL
Note:
Only silicone sealants which
have been developed and tested
specifically for structural
glazing applications should be
used for glazing purposes.