Fasten the header bracket to the wall, Fasten the header bracket to the ceiling, Installation step 2 – Craftsman 139.53675SRT User Manual
Page 14: Install the header bracket
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Installation Step 2
Install the Header Bracket
You can attach the header bracket either to the
wall above the garage door, or to the ceiling.
Follow the Instructions which will work best for
your particuiar requirements.
Fasten the Header Bracket to the Wall
' Center the bracket on the vertical guideline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
2X4
Slrucsural
ЗиррюЯ
' Mark either set of bracket holes (do not use the
holes designated for ceiling mount). Drill 3/16’ pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
Lag Screws
Sn6*xax1-5/8*
Wai!
Mooniing Holes
The nai! hole is for posHionirtg
onfy. You must use ¿g scraws to
mount the header btaelteL
Optionai
Wsif Moontiog
Holes
'1
Highest
Point of Travel
(of Garage Door]
Verttcai
Center
Line
Hardware Shown Actual Size
[i>
LagSaew
S/IS'-BXI-SB*
Fasten the Header Bracket to the Ceiling
’ Extend the vertical guideline onto the ceiling as
shown.
’ Center the bracket on the vertical mark, no more
than 6“ from the wail. Make sure the arrow is
pointing toward the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal
' Mark holes designated for ceiling mount only. Drill
3/16" pilot holes and fasten bracket securely to a
structural support with the hardware provided
CeiSng Mounting Holes
Rnishetl
Coiilng
The nail hole is for positioning only
You musl use lag screws So mouns
She header bractes.
Lag Screws
s/i6’xsxi'Sra'
Header
■ Wall "
1