beautypg.com

Stud bolt installation – Tomei Powered TURBO OUTLET (DOWN PIPES) User Manual

Page 6

background image

1. STUD BOLT INSTALLATION

Install the stud with the double nut fitted onto the TOMEI outlet pipe.

① Fit the double nut on the long treaded side
of the stud bolt.

② Install the stud bolt to the TOMEI outlet pipe.

③ Tighten the nut with a torque wrench.

 Torque  

M10 24.5~29.4N・m (2.5~3.0kgm)

④ Remove the double nut.

CAUTION

* Use the double nut to mount it.

Be careful NOT to move the stud bolt when

* Note the bolt length direction when

removing the nuts.

installing.

If the bolt moves, you'll have to repeat the

* Apply the supplied bolt smooth paste

whole process.

to prevent seizure.

DOUBLE NUT SIDE

TURBO SIDE

LONG

SHORT

M10 STUD BOLT

6