Installation, Site preparation – Dell POWEREDGE M1000E User Manual
Page 10
8
Getting Started Guide
Table 1-1 contains the status LED definitions:
Installation
Site Preparation
Before installing the switch or switches, make sure that the chosen
installation location meets the following site requirements:
•
Clearance — There is adequate front and rear clearance for operator
access. Allow clearance for cabling, power connections, and ventilation.
•
Cabling — The cabling is routed to avoid sources of electrical noise such
as radio transmitters, broadcast amplifiers, power lines, and fluorescent
lighting fixtures.
•
Ambient Temperature — The ambient switch operating temperature
range is 10° to 35ºC (50° to 95ºF).
NOTE:
Decrease the maximum temperature by 1°C (1.8°F) per 300 m (985 ft.)
above 900 m (2955 ft.).
•
Relative Humidity — The operating relative humidity is 8% to 85%
(non-condensing) with a maximum humidity gradation of 10% per hour.
Table 1-1.
PowerConnect M8024-k Power and Status LED Definitions
LED
Color Definition
Green
Power is being supplied to the switch.
Off
The switch does not have power.
Blue
The switch is operating normally.
Off
The switch is powered off.
Amber
A fault has occurred, or the switch is currently booting.