Adhere to the following criteria when selecting, sizing, and
installing the duct system:

1. Units are shipped for horizontal duct installation (by

removing duct covers).

2. Select and size ductwork, supply--air registers, and

return--air grilles according to American Society of Heating,

Refrigeration and Air Conditioning Engineers (ASHRAE)
recommendations.

3. Use flexible transition between rigid ductwork and unit to

prevent transmission of vibration. The transition may be
screwed or bolted to duct flanges. Use suitable gaskets to

ensure weather--tight and airtight seal.

4. All units must have field--supplied filters or accessory filter

rack installed in the return--air side of the unit.

Recommended sizes for filters are shown in Table 1.

5. Size all ductwork for maximum required airflow (either

heating or cooling) for unit being installed. Avoid abrupt
duct size increases or decreases or performance may be
affected.

6. Adequately insulate and weatherproof all ductwork located

outdoors. Insulate ducts passing through unconditioned

space, and use vapor barrier in accordance with latest issue
of Sheet Metal and Air Conditioning Contractors National

Association (SMACNA) and Air Conditioning Contractors
of America (ACCA) minimum installation standards for
heating and air conditioning systems. Secure all ducts to

building structure.

7. Flash, weatherproof, and vibration isolate all openings in

building structure in accordance with local codes and good
building practices.

Step 10 — Install Electrical Connections

ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal

injury or death.
The unit cabinet must have an uninterrupted, unbroken

electrical ground. This ground may consist of an electrical

wire connected to the unit ground screw in the control

compartment, or conduit approved for electrical ground

when installed in accordance with NFPA 70 (NEC) (latest

edition) (in Canada, Canadian Electrical Code CSA C22.1)

and local electrical codes.

!

WARNING

UNIT COMPONENT DAMAGE HAZARD
Failure to follow this caution may result in damage to the

unit being installed.

1. Make all electrical connections in accordance with NFPA

70 (NEC) (latest edition) and local electrical codes
governing such wiring. In Canada, all electrical

connections must be in accordance with CSA standard
C22.1 Canadian Electrical Code Part 1 and applicable
local codes. Refer to unit wiring diagram.

2. Use only copper conductor for connections between

field--supplied electrical disconnect switch and unit. DO

NOT USE ALUMINUM WIRE.

3. Be sure that high--voltage power to unit is within

operating voltage range indicated on unit rating plate. On

3--phase units, ensure phases are balanced within 2
percent. Consult local power company for correction of

improper voltage and/or phase imbalance.

4. Insulate low--voltage wires for highest voltage contained

within conduit when low--voltage control wires are in
same conduit as high--voltage wires.

5. Do not damage internal components when drilling

through any panel to mount electrical hardware, conduit,
etc.

!

CAUTION

High--Voltage Connections

When routing power leads into unit, use only copper wire between

disconnect and unit. The high voltage leads should be in a conduit
until they enter the duct panel; conduit termination at the duct

panel must be watertight.
The unit must have a separate electrical service with a

field--supplied, waterproof disconnect switch mounted at, or within

sight from, the unit. Refer to the unit rating plate, NEC and local
codes for maximum fuse/circuit breaker size and minimum circuit

amps (ampacity) for wire sizing.
The field--supplied disconnect switch box may be mounted on the

unit over the high--voltage inlet hole when the standard power and

low--voltage entry points are used (See Fig. 3 and 4 for acceptable
location).
See unit wiring label (Fig. 15, 16 and 17) and Fig. 11 for reference
when making high voltage connections. Proceed as follows to

complete the high--voltage connections to the unit.
Single phase units:

1. Run the high--voltage (L1, L2) and ground lead into the

control box.

2. Connect ground lead to chassis ground connection.
3. Locate the black and yellow wires connected to the line side

of the contactor.

4. Connect field L1 to black wire on connection 11 of the

compressor contactor.

5. Connect field wire L2 to yellow wire on connection 23 of

the compressor contactor.

Three--phase units:

1. Run the high--voltage (L1, L2, L3) and ground lead into the

control box.

2. Connect ground lead to chassis ground connection.
3. Locate the black and yellow wires connected to the line side

of the contactor.

48E