beautypg.com

Figure 2-1 – Cisco 2940 User Manual

Page 36

background image

2-6

Catalyst 2940 Switch Hardware Installation Guide

OL-6157-01

Chapter 2 Installation

Installing the Switch

Figure 2-1

Installing the Mounting Screws on Top of a Desk

Step 3

Peel the adhesive strip off the bottom of the screw template, and attach it to the top of the desk.

Step 4

Use a 0.144-inch (3.7 mm) or a #27 drill bit to drill a 1/2-inch (12.7 mm) hole in the two screw
template slots.

Step 5

Insert three screws in the slots on the screw template, and tighten until they touch the top of the screw
template.

Step 6

Remove the screw template from the desk top.

1

Screw template

3

Wall

2

Screws

4

Desk

89859

4

1

3

2

2