Attaching the cable-management arm retainer, Replacing the rack doors – Dell PowerEdge 2900 User Manual
Page 22

20
Rack Installation Guide
Attaching the Cable-Management Arm Retainer
The cable-management arm retainer keeps the cable-management arm in place. To attach the cable-
management arm retainer:
1 Connect the release latch on the cable-management arm retainer to the tab on the outer slide
assembly. See Figure 1-10.
NOTE:
Attach the cable-management arm retainer to the side opposite of where you attach the cable-management
arm (see Figure 1-10).
2 Fold the cable-management arm retainer until it locks into place behind the cable-management arm.
To unlock the cable-management arm retainer:
1 Press the blue button on the cable-management arm retainer while lifting the retainer arm.
2 Rotate the arm of the retainer to an open position.
Figure 1-10.
Cable-Management Arm Retainer
Replacing the Rack Doors
See the procedures for replacing doors in the documentation provided with your rack cabinets.
This completes the rack installation of your system.
1
release latch on cable-
management arm retainer
2
cable-management arm retainer
3
blue button
4
metal tab
1
4
back of system
2
3